Bathroom Remodel Cost in Henderson, NV (2026)

What a bathroom remodel actually costs in Henderson — Green Valley to MacDonald Highlands — with line-item budgets, City of Henderson permit fees and HOA review notes pulled from our recent projects.

Based on Build4U's actual 2025–2026 Henderson project costs. NSCB license #0095372.

Quick answer

$19.5K – $145K+Most Henderson bathrooms land in the $43K – $90K band.

Tier 1 — Guest bath, full gut

$19.5K – $37K

Typical 5×8 to 6×10 hall or guest bath in Green Valley, Whitney Ranch or Inspirada. Same footprint, new everything.

Demo + dump + protection$1.6K – $2.7K
Framing + waterproofing (Schluter/Kerdi)$2.3K – $3.9K
Plumbing rough-in + new fixtures$3.1K – $5.5K
Electrical rough-in + lighting + GFCI$1.6K – $3.1K
Tile floor + tub/shower surround + install$3.9K – $8K
Vanity + stone top + mirror$2K – $3.9K
Glass enclosure or new tub$1.2K – $3.1K
City of Henderson permits + design + PM$3.1K – $5.5K

Tier 2 — Primary-suite bathroom

$43K – $90K

Full primary bath in Seven Hills, Anthem or Madeira Canyon. New layout, larger shower, separate tub, double vanity, upgraded stone.

Demo + framing + waterproofing$6K – $11K
Plumbing re-route + premium fixtures$8K – $14K
Electrical + designer lighting + heated mirrors$3.9K – $7K
Large-format tile or slab walls + floor$9.5K – $17K
Custom double vanity + quartzite top$6K – $12.5K
Freestanding tub + glass enclosure$3.9K – $8.5K
Permits + design + project management$5.5K – $11K
Paint, trim, hardware, accessories$1.6K – $3.9K

Tier 3 — Wet room / luxury suite

$94K – $145K+

MacDonald Highlands / Ascaya level finishes. Curbless wet-room, freestanding tub on waterproof zone, steam, heated floors.

Curbless wet-room framing + sloped pan + waterproofing$11K – $17K
Steam generator + steam-rated enclosure$6K – $11K
Heated floors (electric or hydronic)$3.1K – $6K
Slab stone walls + book-matched accent$17K – $31K
Custom vanity millwork + integrated stone$11.5K – $22K
Pro plumbing package (thermostatic, body sprays)$11K – $18.5K
Designer lighting + smart controls$4.7K – $9.5K
Permits, engineering, plan review$3.9K – $8K
Design + project management$11.5K – $19.5K

Henderson permit + HOA notes

  • City of Henderson Building & Fire Safety — separate plan-review queue from Clark County. Typical bathroom permit $300–$900, plan review 1–3 weeks.
  • Anthem Country Club — interior-only remodels skip review; exterior vent or window changes require ARC submittal (~3 weeks).
  • MacDonald Highlands / Dragon Ridge — strict architectural review for any exterior element; plan 4 weeks lead time.
  • Seven Hills, Madeira Canyon, Roma Hills — moderate review; exterior changes ~2–3 weeks.
  • Green Valley, Whitney Ranch, Inspirada — most subdivisions have light or no review for interior bathroom work.

Related

Next step

We'll put together an itemized estimate so you know exactly where every dollar goes before construction starts.

FAQs

How much does a bathroom remodel cost in Henderson in 2026?

Guest baths run $19.5K–$37K, primary-suite baths $43K–$90K, and full wet-room suites $94K–$145K+. Henderson budgets track Las Vegas closely; HOA-heavy communities (Anthem CC, MacDonald Highlands, Seven Hills) add 1–4 weeks for architectural review but not material cost.

Does the City of Henderson permit process differ from Clark County?

Yes. Henderson runs its own Building & Fire Safety department with separate plan-review queues and inspection scheduling. Permit fees are comparable ($300–$900 for a bathroom) but turnaround can be 1–2 weeks faster than unincorporated Clark County on straightforward submittals.

Do Anthem CC, MacDonald Highlands or Seven Hills require HOA review for a bathroom remodel?

Interior-only bathroom remodels generally don't trigger architectural review. Anything that changes an exterior window, adds a roof vent, or alters the exterior elevation does — plan 2–4 weeks for committee approval before permit submittal.

What's included in a Henderson bathroom quote?

Design, City of Henderson permits, demolition, framing, waterproofing, plumbing, electrical, tile, vanity and stone, lighting, paint, fixture install, project management and final cleanup. Same scope as our Las Vegas projects.

How long does a Henderson bathroom remodel take?

Most full bathroom remodels run 6–10 weeks on-site, plus 3–6 weeks of selections and material lead time. Wet-room builds with custom glass run 8–12 weeks on-site. Add 2–4 weeks if your HOA requires architectural review for exterior changes.

Build4U Remodeling Logo

Let's talk

Ready to remodel?
Let's begin.

Free in-home consultation across the Las Vegas Valley. We'll walk the project, talk budget, and send a clear next-steps proposal within 48 hours.

Follow us

Free in-home consult

Tell us about your project

Two minutes to a real estimate. We'll reply within ~2 business hours, Mon–Sat.

Call now
Financing options ›