Paradise, NV
Kitchen Remodeling in Paradise, NV
Build4U designs and builds custom kitchens across Paradise — Paradise Palms mid-century homes, Tropicana / Eastern corridor and Hughes Center adjacency. One team handles design, Clark County permits, cabinetry, appliances and installation.

Trusted by Homeowners & the Industry
Working in Paradise
Paradise Palms mid-century homes have the bones for spectacular kitchens — original post-and-beam ceilings and clean window walls. We renovate them with respect for the original architecture: clean-line cabinetry, integrated appliances and stone that doesn't fight the period.
Clark County Department of Building & Fire Prevention permitting handled in-house, including structural, mechanical, electrical and plumbing.
Neighborhoods we serve
- Paradise Palms (mid-century)
- Tropicana & Eastern corridor
- Pinto Lane / Spencer
- Sunrise Manor (south)
- Hughes Center adjacency
- Near McCarran / Harry Reid
Nevada State Contractors Board GC license #0095372 · General liability + workers' comp · BBB-rated · Over a decade building in the Las Vegas Valley.
Paradise pricing
What a kitchen remodeling typically costs in Paradise
Paradise kitchen pricing spans a wide band because the housing stock does — mid-century Paradise Palms ranches sit next to 2000s builds off Tropicana. Real 2025 Paradise ranges:
- Keep existing layout
- Reface or paint cabinets
- New quartz counters
- New backsplash, sink, faucet
- Updated lighting & hardware
- Semi-custom cabinetry, new layout
- Open kitchen to living space
- Quartz counters, full backsplash
- New appliance package
- Clark County permits handled
- Custom cabinetry, period-correct or modern
- Stone counters + slab backsplash
- Premium appliance package
- Engineered structural opening
- Re-pipe and re-wire where needed
- Designer lighting & millwork
Cost breakdown
Where the money goes in a Paradise kitchen remodeling
Based on our mid-range Paradise projects ($72,000 – $135,000). Percentages are shares of the total contract, not add-ons — every line below is already inside the fixed price you sign.
| Line item | Share | Typical spend |
|---|---|---|
| Cabinetry & millworkBiggest single line. Semi-custom to full custom boxes, doors, drawer hardware and any built-in panels. | 32% | $23,000 – $43,200 |
| Labor & project managementOur own carpenters, tile setters and finishers, plus the project lead who runs the schedule and inspections. | 24% | $17,300 – $32,400 |
| Countertops & backsplashSlab cost, template, fabrication, waterfall and edge detail, plus tile or slab backsplash. | 12% | $8,600 – $16,200 |
| AppliancesPackage cost swings the widest here — panel-ready and pro ranges can double this line on their own. | 11% | $7,900 – $14,900 |
| Plumbing, electrical & HVACRough-in and trim, added circuits, code-required upgrades, vent runs for the new hood location. | 10% | $7,200 – $13,500 |
| Flooring, paint & drywallPatch and finish after demo, plus continuous flooring where the old kitchen footprint changes. | 6% | $4,300 – $8,100 |
| Design, engineering & 3DMeasured as-builts, full construction drawings, renders and the spec book you sign off on. | 3% | $2,200 – $4,100 |
| Permits & inspectionsJurisdiction fees and plan review, pulled under NSCB #0095372 — never under your name. | 2% | $1,400 – $2,700 |
Process
How a Paradise kitchen remodeling runs, week by week
- 01Week 1Discovery & site walk
We walk the home, measure as-built, listen to how you actually use the kitchen, and align on scope and budget before anyone signs anything.
- 02Weeks 2–6Design & material selections
Architectural drawings, full 3D renders and a complete spec book — cabinetry, stone, tile, hardware, appliances. You sign off on everything before we order.
- 03Weeks 6–10Permits & material lead time
We submit permits and place every order in parallel. Custom cabinetry is the long pole; stone and appliances follow. Demo starts only when materials are on-site.
- 04Weeks 11–13Demo & rough-in
Selective demo, structural opening (if any), plumbing rough, electrical rough, HVAC adjustments. Inspections passed before close-up.
- 05Weeks 14–17Cabinetry, stone, appliances
Cabinet install, template-and-fabricate stone, appliance install, tile and paint. The kitchen takes shape in this window.
- 06Weeks 18–20Finish & handover
Plumbing trim, electrical trim, punch list, deep clean, walk-through. You get a binder with every spec, warranty and care guide before we hand over the keys.
Local detail
What's different about a kitchen remodel in Paradise
Paradise has the oldest housing stock we regularly work in — Paradise Palms and the Tropicana/Eastern corridor are largely 1960s mid-century. Those homes have galvanized supply lines, undersized electrical panels and original cast-iron drains. On a full Paradise kitchen we budget for a partial re-pipe and a panel upgrade up front rather than discovering it behind the wall.
Mid-century Paradise kitchens are worth designing with restraint. Flat-panel walnut or white-oak cabinetry, slim-shaker at most, and a full-height slab backsplash read correctly in a Paradise Palms house; heavy raised-panel millwork does not. We render both if you're undecided.
Unincorporated Paradise is Clark County jurisdiction — same portal and reviewers as Spring Valley and Enterprise, typically 2–3 weeks on kitchen plan review. Older-home scopes that include re-pipe or panel work add an electrical and plumbing inspection but rarely add calendar time if we sequence them together.
Most Paradise lots are flat with alley or wide-driveway access, which makes staging and debris haul-off simple. That keeps demo cost lower here than in tighter Summerlin or Henderson hillside lots.
Build4U pulls Clark County Department of Building & Fire Prevention permits in-house for Paradise kitchen remodels — structural, mechanical, electrical and plumbing. Typical plan-review turnaround runs 2–3 weeks. On pre-1980 Paradise homes we add the electrical service and plumbing supply scope to the same submittal so the inspections stack instead of stringing out the schedule.
5.0 · 2 reviews
What Paradise homeowners say
"The detail in our kitchen is unreal — every reveal, every shadow line. Worth every penny."
"Most contractors disappear after the deposit. This team showed up every single day."
Recent kitchen remodeling projects across the Las Vegas Valley
All projects →These are Build4U jobs in neighboring valley communities — same crews, same kitchen remodeling scope, same NSCB #0095372 license that builds in Paradise. Each card shows where the project was actually built.
More in Paradise
Other services we offer in Paradise
Paradise FAQ
Kitchen Remodeling in Paradise, answered.

Ready to remodel? Let's begin.
Free in-home consultation across the Las Vegas Valley — clear next-steps proposal within 48 hours.
5329 Cameron St #104-B, Las Vegas, NV 89118Mon–Fri 8:00 AM–6:00 PM · Sat 9:00 AM–2:00 PM (by appointment)Serving Henderson, Summerlin, Paradise, North Las Vegas & Spring Valley

