Casita & ADU Construction
Las Vegas ADU Builder
Build4U is a licensed Las Vegas ADU builder designing and constructing detached accessory dwelling units across the Valley — guest houses, in-law suites, pool casitas, rental ADUs and home-office studios. Every Las Vegas ADU project covers zoning checks, architectural plan-sets, City of Las Vegas / Henderson / Clark County permitting, foundation, framing and finish under one contract, so you get one fixed timeline and one accountable team.

What's included
- Zoning, setback and lot-coverage analysis up front
- Architectural plan set and engineered structural drawings
- Permitting with Clark County, City of Las Vegas or City of Henderson
- Site prep, foundation, framing and roofing
- Full MEP — separate or sub-metered electrical, plumbing and HVAC
- Interior finish including kitchenette or full kitchen, bath, flooring and millwork
Build4U is a licensed Las Vegas ADU and casita builder designing and constructing detached accessory dwelling units across the Valley — guest houses, in-law suites, pool casitas, rental ADUs, and detached home-office studios. Every ADU project starts with a real zoning check on your specific parcel before any design work, runs through full architectural and structural plan sets, handles permitting with Clark County, City of Las Vegas, or City of Henderson, and finishes with the same construction quality as our remodels. One contract, one team, one fixed timeline from feasibility to certificate of occupancy.
Zoning first — what's actually buildable on your parcel
The single biggest variable in any ADU project is what's legally allowed on your specific lot. Clark County, the City of Las Vegas and the City of Henderson each have their own setback rules, lot-coverage maximums, height restrictions, parking requirements and utility-separation standards. Many parcels can support a 600–1,000 sq ft ADU; some can support a 1,200+ sq ft unit with a full kitchen and a separate address; others can't support anything at all. We run the zoning check up front — typically in the first two weeks, before any design fees — so you know exactly what's possible before you spend money on architecture.
Design that matches the main house, not a separate building
A well-designed casita reads as if the main house grew an extra wing — same stucco color and texture, same window line, same roof profile, same trim details. A poorly designed one looks like a portable building parked in the backyard. We model both the casita and the main house together during design, match exterior elevations carefully, and finish the interior to the same standard as our remodels — rift-cut oak millwork, honed stone counters, integrated appliances. The result is a unit that adds value to the property rather than subtracting from it.
Full architectural plans, structural engineering, MEP
Every ADU we build gets a full architectural plan set, structural engineering stamps, and complete MEP routing — not a stock plan. That's the difference between a unit that passes inspection cleanly and one that gets stuck in plan check for months. We coordinate with structural engineers for any unusual conditions (steep lots, retained walls, expansive soil), route MEP for either shared or separate utilities depending on the use case, and detail everything for the specific jurisdiction's review standards.
Permitting we handle — Clark County, City of LV, City of Henderson
Permit submittal, plan-check correspondence, structural review, energy review, and the inevitable revision rounds all run through us. Typical plan-check turnaround is 8–12 weeks; we keep the schedule moving by responding to corrections within the week and tracking each reviewer's outstanding items. By the time you're at the certificate of occupancy stage, every inspection has been signed off cleanly and the unit is fully legal to occupy and (depending on jurisdiction and intent) to rent.
Pricing
What a casita & adu construction typically costs
ADU and casita cost in Las Vegas comes down to square footage, kitchen scope, and whether the unit has separate utilities. 2025 ranges across our valley-wide projects:
- ~400–600 sq ft
- Bedroom + bath + kitchenette
- Shared utilities with main house
- Stucco exterior matched to main
- Single permit submittal
- ~600–900 sq ft
- Bedroom + bath + full kitchen + living
- Separate or sub-metered utilities
- Full architectural plan set
- Zoning + HOA coordination
- ~900–1,200 sq ft
- 2 bed + 1.5 bath + full kitchen
- Separate utilities + separate address
- Engineered structural, separate entry
- Long-term rental ready
Process
How a Las Vegas ADU project runs, week by week
- 01Weeks 1–2Feasibility & zoning check
We pull your parcel data, run setback and lot-coverage analysis against the jurisdiction (Clark County, City of Las Vegas, or City of Henderson) and confirm what's actually buildable before any design fees.
- 02Weeks 3–8Design & engineering
Architectural plan set, structural engineering, MEP routing, exterior elevations matched to the main house. You sign off on a full 3D walkthrough before we submit.
- 03Weeks 9–14Permit & plan check
Permit submittal with the right jurisdiction, structural and energy review, plan-check revisions, utility coordination. Typical Clark County / City of Henderson turnaround is 8–12 weeks.
- 04Weeks 15–17Site prep & foundation
Site clearing, utility trenching, foundation form-and-pour, underground plumbing rough. Foundation inspection signed off before framing.
- 05Weeks 18–23Framing, MEP, roof
Stick framing, roof framing and dry-in, MEP rough (electrical, plumbing, HVAC), insulation. Three inspections in this window — framing, MEP rough, insulation.
- 06Weeks 24–30Interior finish & handover
Drywall, paint, flooring, cabinetry, tile, appliances, fixtures, exterior stucco match. Final inspection, certificate of occupancy, full warranty binder.
Exterior match, interior finish, MEP brands
- Color-matched stucco systems
- Matching window line (Andersen, Milgard)
- Tile/shingle roof matched to main house
Exterior elevations modeled against the main house — same texture, same window proportions, same roof line.
- Rift oak or painted inset cabinetry
- Quartz, quartzite or porcelain counters
- Engineered hardwood or LVP flooring
- Integrated appliances (matched to use case)
Finish level matches the main house remodel standard — not a downgrade just because it's an ADU.
- Carrier / Lennox HVAC mini-splits
- Separate or sub-metered electrical
- Tankless water heater (Navien / Rinnai)
Mini-split HVAC standard for ADUs — zoned, efficient, no need for ducts. Tankless heaters save space and run forever.
Service areas
Casita & ADU Construction across the Las Vegas Valley
FAQ
Casita & ADU Construction questions, answered.

Let's talk
Ready to remodel?
Let's begin.
Free in-home consultation across the Las Vegas Valley. We'll walk the project, talk budget, and send a clear next-steps proposal within 48 hours.
- (702) 500-1595
- hello@build4u.com
- 5329 Cameron St #104-B, Las Vegas, NV 89118 · Serving Henderson, Summerlin, Paradise, North Las Vegas & Spring Valley