Build4U is a North Las Vegas casita and ADU builder constructing detached accessory dwelling units across Aliante, Tuscany Village, Eldorado and Park Highlands. We handle City of North Las Vegas zoning, permitting, foundation and full finish under one contract.

Trusted by Homeowners & the Industry
Working in North Las Vegas
City of North Las Vegas permits accessory dwelling units on most single-family parcels — Aliante in particular has many lots with the depth for a 700–1,000 sq ft detached casita. We run a zoning check on your parcel first so the design fits.
City of North Las Vegas permitting handled in-house, including structural, mechanical, electrical and plumbing. HOA architectural review coordinated for Aliante, Tuscany Village and Park Highlands.
Neighborhoods we serve
- Aliante
- Tuscany Village
- Eldorado
- Park Highlands
- The Hills at Aliante
- Sunrise Manor (north)
Nevada State Contractors Board GC license #0095372 · General liability + workers' comp · BBB-rated · Over a decade building in the Las Vegas Valley.
North Las Vegas pricing
What a casita & adu construction typically costs in North Las Vegas
North Las Vegas casita pricing is the most accessible in the Valley — newer construction, generous lots in Aliante and Park Highlands, and a straightforward city permit path. Real 2025 North Las Vegas ranges:
- 350–550 sq ft attached to the main house
- Bedroom, full bath, living area
- Kitchenette with sink and under-counter fridge
- Shared utilities from the main panel
- Private exterior entry
- City of North Las Vegas permits & inspections
- 500–800 sq ft standalone structure
- Full kitchen, bath, bedroom and living
- Dedicated mini-split HVAC
- Utility trenching from the main house
- Stucco and roof matched to the main home
- HOA architectural review handled
- 800–1,200 sq ft with full kitchen and laundry
- Custom cabinetry and stone throughout
- Covered patio connection
- Dedicated HVAC and water heater
- Optional garage or workshop bay
- Full architectural and engineering package
Process
How a North Las Vegas casita & adu construction runs, week by week
- 01Weeks 1–3Feasibility & zoning check
We verify lot coverage, setbacks, maximum ADU square footage, parking and utility capacity with your jurisdiction before you spend a dollar on design.
- 02Weeks 4–10Design & engineering
Site plan, floor plan, elevations, structural engineering, Title 24 energy compliance and a full finish spec. HOA architectural packet drafted in the same window.
- 03Weeks 11–18Permits & HOA review
ADU permits are the long pole on any casita — plan review plus HOA approval typically runs 8–14 weeks. We submit, track and answer reviewer comments on your behalf.
- 04Weeks 19–23Site work & foundation
Grading, utility trenching from the main house, footings and slab pour, with foundation inspection before framing.
- 05Weeks 24–31Framing, shell & rough-in
Framing, roof, windows and doors, stucco, then plumbing, electrical and mini-split HVAC rough-in with inspections at each stage.
- 06Weeks 32–39Interior finish
Insulation, drywall, kitchenette or full kitchen, bathroom tile and fixtures, flooring, paint, trim and lighting.
- 07Weeks 40–42Final inspection & handover
Final building inspection, certificate of occupancy, punch list, clean and walk-through with the full warranty binder.
Local detail
What's different about building a casita in North Las Vegas
North Las Vegas is where multigenerational casitas make the most sense right now. Aliante and Park Highlands lots are large, the construction is 2000s-and-later so utility capacity is rarely a constraint, and per-square-foot build cost runs below Henderson and Summerlin for the identical structure.
City of North Las Vegas governs accessory-dwelling size, height, setbacks and lot coverage, and the rules are parcel-specific. We pull your parcel data and confirm the maximum buildable casita before design starts, because that number sets the floor plan.
Aliante and several Tuscany Village sub-HOAs review detached structures for height, roof pitch, stucco color and window placement. Review cycles here are shorter than Summerlin — typically 2–5 weeks — and approvals are more predictable when the packet is complete on first submittal.
Newer construction means the main home's electrical panel and water heater usually have capacity to serve a casita without a service upgrade. We still load-calculate during design, but North Las Vegas projects avoid the panel-upgrade line item that older-stock casitas frequently carry.
Casita permits are submitted to City of North Las Vegas Building & Safety as a new accessory structure — site plan, floor plan, elevations, structural calculations and energy compliance. Plan review typically runs 5–10 weeks. HOA architectural review (Aliante, Tuscany Village, Park Highlands) runs in parallel where required. Build4U prepares, submits and tracks both packages and answers every reviewer comment directly.
5.0 · 1 reviews
What North Las Vegas homeowners say
"Most contractors disappear after the deposit. This team showed up every single day."
More in North Las Vegas
Other services we offer in North Las Vegas
North Las Vegas FAQ
Casita & ADU Construction in North Las Vegas, answered.

Ready to remodel? Let's begin.
Free in-home consultation across the Las Vegas Valley — clear next-steps proposal within 48 hours.
5329 Cameron St #104-B, Las Vegas, NV 89118Mon–Fri 8:00 AM–6:00 PM · Sat 9:00 AM–2:00 PM (by appointment)Serving Henderson, Summerlin, Paradise, North Las Vegas & Spring Valley