Skip to content

Paradise, NV

Bathroom Remodeling in Paradise, NV

Build4U rebuilds Paradise bathrooms with a calm material palette and an eye for the neighborhood's mid-century roots — wet rooms, freestanding tubs, custom vanities and warm stone.

Spa-inspired bathroom remodel in Paradise NV by Build4U

Trusted by Homeowners & the Industry

Google
Yelp
facebook
Nextdoor
houzz
Angi
BBB
The HomeMag
NSCB Licensed
Insured & Bonded
EPA Lead-Safe
Chamber Member

Working in Paradise

Paradise Palms primary baths are often original-tile and original-fixtures candidates for a full gut. We handle waterproofing, plumbing relocation and steam install in-house and pull Clark County plumbing permits.

Permits & review

Clark County Department of Building & Fire Prevention permitting handled in-house, including structural, mechanical, electrical and plumbing.

Neighborhoods we serve

  • Paradise Palms (mid-century)
  • Tropicana & Eastern corridor
  • Pinto Lane / Spencer
  • Sunrise Manor (south)
  • Hughes Center adjacency
  • Near McCarran / Harry Reid
Valley-wide guide: Bathroom remodel Las Vegas — 2026 pricing, timelines and a permit guide for every valley jurisdiction — Clark County, Las Vegas, Henderson and North Las Vegas.

Nevada State Contractors Board GC license #0095372 · General liability + workers' comp · BBB-rated · Over a decade building in the Las Vegas Valley.

Paradise pricing

What a bathroom remodeling typically costs in Paradise

Paradise bathroom pricing depends heavily on the age of the home — a 2000s build off Eastern prices like Spring Valley, a 1960s Paradise Palms bath carries plumbing and electrical work. Real 2025 Paradise ranges:

Guest bath refresh
$20,000 – $38,000
  • Existing footprint
  • New tile floor & shower surround
  • New vanity & quartz top
  • New toilet, fixtures, lighting
Primary suite remodel
$45,000 – $92,000
  • Reconfigured layout
  • Custom vanity, dual sinks
  • Frameless glass shower
  • Freestanding tub
  • Supply-line replacement where needed
  • Permits & inspections
Luxury wet-room suite
$95,000 – $155,000+
  • Curbless wet room
  • Steam generator + body sprays
  • Heated floors
  • Slab stone walls
  • Custom millwork vanity

Cost breakdown

Where the money goes in a Paradise bathroom remodeling

Based on our mid-range Paradise projects ($45,000 – $92,000). Percentages are shares of the total contract, not add-ons — every line below is already inside the fixed price you sign.

Cost breakdown for a mid-range bathroom remodeling project in Paradise
Line itemShareTypical spend
Labor & project managementBathrooms are labor-dense: waterproofing, slope, tile layout and glass fitting all have to be exact.28%$12,600 – $25,800
Tile, stone & waterproofingMaterial plus the Schluter-Kerdi assembly behind it. This is the line you never want value-engineered.20%$9,000 – $18,400
Vanity, cabinetry & mirrorsCustom or semi-custom vanity, linen storage, integrated lighting and mirror package.14%$6,300 – $12,900
Plumbing rough-in & fixturesDrain and supply relocation, valves, freestanding-tub filler, shower system and trim.13%$5,900 – $12,000
Glass & shower enclosureFrameless heavy glass is fabricated to the finished opening, so it's ordered after tile.9%$4,100 – $8,300
Electrical, heat & ventilationAdded circuits, heated floor mat, in-mirror lighting, quiet exhaust sized to the room.8%$3,600 – $7,400
Design & selectionsLayout drawings, elevations and the full finish schedule before demo starts.5%$2,300 – $4,600
Permits & inspectionsPlumbing and electrical permits with the governing jurisdiction, pulled on our license.3%$1,400 – $2,800

Process

How a Paradise bathroom remodeling runs, week by week

  1. 01Week 1
    Discovery & site walk

    We walk the bathroom, scan existing plumbing, talk about how the room actually works for you, and align on scope and budget.

  2. 02Weeks 2–5
    Design & selections

    Layout drawings, 3D renders, full material spec — vanity, stone, tile, fixtures, glass. You approve before anything is ordered.

  3. 03Weeks 5–8
    Permits & lead time

    Plumbing and mechanical permits submitted; custom vanity, stone slab and glass enclosure ordered. We don't start demo until materials are on-site.

  4. 04Weeks 9–10
    Demo & rough-in

    Demo to studs and slab, new waterproofing membrane, plumbing rough, electrical rough, niche and bench framing, slope pour for curbless showers.

  5. 05Weeks 11–13
    Tile, stone, finishes

    Tile setting, stone install, vanity drop, paint, trim. Glass measured after tile is set and ordered for install in the final week.

  6. 06Weeks 14–15
    Trim, glass & handover

    Plumbing trim, electrical trim, glass install, punch list, deep clean, walk-through. Full warranty binder at handover.

Local detail

What's different about a bathroom remodel in Paradise

Original Paradise bathrooms are small by modern standards — a 5-ft tub alcove, one vanity, a separate water closet. Getting a real primary suite usually means borrowing depth from an adjacent closet or hallway. We model those options in 3D during design so you can see the trade before framing moves.

Cast-iron drain lines are common in pre-1970 Paradise homes. When we open the floor we scope the line; if it's scaling or cracked we replace it back to the stack while the slab is already cut. Doing it later means cutting a finished bathroom apart.

Older Paradise bathrooms frequently have no dedicated exhaust or a fan venting into the attic instead of through the roof. Every Build4U bathroom gets a properly sized, roof-terminated exhaust fan — it's the single biggest factor in whether new tile and paint hold up in a desert climate.

Pre-1980 Paradise homes get a hazardous-material check before demo. Original sheet vinyl, mastic and some wall texture from that era can contain asbestos. We test rather than guess, and coordinate certified abatement into the schedule if it's needed.

Permits & jurisdiction

Plumbing, mechanical and electrical permits pulled with Clark County Department of Building & Fire Prevention in-house. Typical Paradise turnaround is 2–3 weeks. Slab cut and pour-back inspections are scheduled around drain relocations, and shower-pan water tests happen before tile-in. On pre-1980 homes we add the hazardous-material clearance to the front of the schedule so demo isn't held up.

5.0 · 1 reviews

What Paradise homeowners say

"Most contractors disappear after the deposit. This team showed up every single day."

Priya N.

Recent bathroom remodeling projects across the Las Vegas Valley

All projects →

These are Build4U jobs in neighboring valley communities — same crews, same bathroom remodeling scope, same NSCB #0095372 license that builds in Paradise. Each card shows where the project was actually built.

Paradise FAQ

Bathroom Remodeling in Paradise, answered.