Skip to content

Enterprise, NV

Bathroom Remodeling in Enterprise & Mountain's Edge

Build4U rebuilds Enterprise bathrooms as full spa retreats — curbless wet rooms, freestanding tubs, custom vanities. Every project is a full gut by our own crews.

Spa-inspired bathroom remodel in Enterprise / Mountain's Edge Las Vegas by Build4U

Trusted by Homeowners & the Industry

Google
Yelp
facebook
Nextdoor
houzz
Angi
BBB
The HomeMag
NSCB Licensed
Insured & Bonded
EPA Lead-Safe
Chamber Member

Working in Enterprise

Enterprise primary suites in Mountain's Edge and Southern Highlands typically have the volume for a true wet room with a separate water closet, freestanding tub and dual vanities. We handle waterproofing, slope and steam install in-house.

Permits & review

Clark County Department of Building & Fire Prevention permitting handled in-house, including structural, mechanical, electrical and plumbing. HOA review for Mountain's Edge, Southern Highlands and Silverado Ranch.

Neighborhoods we serve

  • Mountain's Edge
  • Southern Highlands
  • Cactus & Las Vegas Blvd S
  • Silverado Ranch
  • The Vistas at Southern Highlands
  • Rhodes Ranch adjacency
Neighborhood pages in Enterprise
Valley-wide guide: Bathroom remodel Las Vegas — 2026 pricing, timelines and a permit guide for every valley jurisdiction — Clark County, Las Vegas, Henderson and North Las Vegas.

Nevada State Contractors Board GC license #0095372 · General liability + workers' comp · BBB-rated · Over a decade building in the Las Vegas Valley.

Enterprise pricing

What a bathroom remodeling typically costs in Enterprise

Enterprise primary suites in Southern Highlands and Mountain's Edge are large enough for true wet-room layouts without expanding the footprint. Real 2025 Enterprise ranges:

Guest bath refresh
$22,000 – $40,000
  • Existing footprint
  • New tile, vanity, fixtures
  • Quartz top, new toilet
  • Updated lighting
Primary suite remodel
$48,000 – $98,000
  • Reconfigured layout
  • Custom vanity, dual sinks
  • Frameless glass shower
  • Freestanding tub
  • Designer tile & lighting
  • Permits & inspections
Luxury wet-room suite
$105,000 – $165,000+
  • Curbless wet room
  • Steam generator + body sprays
  • Heated floors
  • Full-height slab walls
  • Custom millwork vanity

Cost breakdown

Where the money goes in a Enterprise bathroom remodeling

Based on our mid-range Enterprise projects ($48,000 – $98,000). Percentages are shares of the total contract, not add-ons — every line below is already inside the fixed price you sign.

Cost breakdown for a mid-range bathroom remodeling project in Enterprise
Line itemShareTypical spend
Labor & project managementBathrooms are labor-dense: waterproofing, slope, tile layout and glass fitting all have to be exact.28%$13,400 – $27,400
Tile, stone & waterproofingMaterial plus the Schluter-Kerdi assembly behind it. This is the line you never want value-engineered.20%$9,600 – $19,600
Vanity, cabinetry & mirrorsCustom or semi-custom vanity, linen storage, integrated lighting and mirror package.14%$6,700 – $13,700
Plumbing rough-in & fixturesDrain and supply relocation, valves, freestanding-tub filler, shower system and trim.13%$6,200 – $12,700
Glass & shower enclosureFrameless heavy glass is fabricated to the finished opening, so it's ordered after tile.9%$4,300 – $8,800
Electrical, heat & ventilationAdded circuits, heated floor mat, in-mirror lighting, quiet exhaust sized to the room.8%$3,800 – $7,800
Design & selectionsLayout drawings, elevations and the full finish schedule before demo starts.5%$2,400 – $4,900
Permits & inspectionsPlumbing and electrical permits with the governing jurisdiction, pulled on our license.3%$1,400 – $2,900

Process

How a Enterprise bathroom remodeling runs, week by week

  1. 01Week 1
    Discovery & site walk

    We walk the bathroom, scan existing plumbing, talk about how the room actually works for you, and align on scope and budget.

  2. 02Weeks 2–5
    Design & selections

    Layout drawings, 3D renders, full material spec — vanity, stone, tile, fixtures, glass. You approve before anything is ordered.

  3. 03Weeks 5–8
    Permits & lead time

    Plumbing and mechanical permits submitted; custom vanity, stone slab and glass enclosure ordered. We don't start demo until materials are on-site.

  4. 04Weeks 9–10
    Demo & rough-in

    Demo to studs and slab, new waterproofing membrane, plumbing rough, electrical rough, niche and bench framing, slope pour for curbless showers.

  5. 05Weeks 11–13
    Tile, stone, finishes

    Tile setting, stone install, vanity drop, paint, trim. Glass measured after tile is set and ordered for install in the final week.

  6. 06Weeks 14–15
    Trim, glass & handover

    Plumbing trim, electrical trim, glass install, punch list, deep clean, walk-through. Full warranty binder at handover.

Local detail

What's different about a bathroom remodel in Enterprise

Enterprise primary baths came from the builder with a garden tub nobody uses, a separate shower that's too small, and a lot of dead tile floor between them. Combining that footprint into one curbless wet zone — freestanding tub and a 5–6 ft shower sharing a waterproofed floor — is the single most common Enterprise project we run.

Because the construction is 2000s-and-later, drain relocations are clean: the slab cuts predictably, the framing matches the plans, and the pour-back inspection rarely turns up surprises. That makes Enterprise wet-room conversions faster and more predictable than the same scope in older stock.

Mountain's Edge and Southern Highlands sit at higher elevation with more wind-driven dust. We spec roof-terminated exhaust with backdraft dampers on every Enterprise bathroom, which keeps dust out and moisture properly evacuated.

Water hardness in Enterprise is Valley-average. We default to PVD-finish brushed brass or matte black on primary baths and recommend a softener loop on any luxury wet-room build to protect the stone and the glass.

Permits & jurisdiction

Plumbing, mechanical and electrical permits pulled with Clark County Department of Building & Fire Prevention in-house. Typical Enterprise turnaround is 2–3 weeks. Slab cut and pour-back inspections are scheduled around drain relocations, and shower-pan water tests happen before tile-in. HOA coordination (Southern Highlands, Mountain's Edge, Silverado Ranch) handled where the scope requires it.

5.0 · 1 reviews

What Enterprise homeowners say

"Most contractors disappear after the deposit. This team showed up every single day."

Priya N.

Recent bathroom remodeling projects across the Las Vegas Valley

All projects →

These are Build4U jobs in neighboring valley communities — same crews, same bathroom remodeling scope, same NSCB #0095372 license that builds in Enterprise. Each card shows where the project was actually built.

Enterprise FAQ

Bathroom Remodeling in Enterprise, answered.