Skip to content

Las Vegas, NV

Kitchen Remodeling in Las Vegas

Build4U is a licensed Las Vegas kitchen remodeling contractor designing and building custom kitchens across the entire Valley — from mid-century homes near McCarran to estates in the western foothills. Every Las Vegas kitchen remodel runs as one design-build under a single project manager: design, City of Las Vegas permits, cabinetry, appliances and installation handled by one accountable team.

Kitchen remodeling project in Las Vegas by Build4U

Trusted by Homeowners & the Industry

Google
Yelp
facebook
Nextdoor
houzz
Angi
BBB
The HomeMag
NSCB Licensed
Insured & Bonded
EPA Lead-Safe
Chamber Member

Working in Las Vegas

Las Vegas kitchens span a wide range of housing stock — 1960s and '70s ranches near Paradise, 1990s tract homes in Spring Valley, modern infill across the urban core. Most of the kitchens we remodel inside the City of Las Vegas were laid out as closed-off cooking rooms; the single most common scope is opening the kitchen to the family room with an engineered flush beam. We pull every permit directly with the City of Las Vegas Department of Building & Safety.

Permits & review

City of Las Vegas permitting handled in-house, including structural, mechanical, electrical and plumbing. HOA architectural coordination handled when the parcel triggers it.

Neighborhoods we serve

  • Downtown & Arts District
  • Lone Mountain
  • Tule Springs
  • Centennial Hills
  • Charleston Heights
  • Spring Mountain corridor

Nevada State Contractors Board GC license #0095372 · General liability + workers' comp · BBB-rated · Over a decade building in the Las Vegas Valley.

Las Vegas pricing

What a kitchen remodeling typically costs in Las Vegas

Las Vegas kitchen remodel cost depends on cabinetry tier, layout change scope, and the appliance package. Real 2025 ranges across our City of Las Vegas projects:

Cosmetic refresh
$45,000 – $78,000
  • Keep existing layout & footprint
  • Paint or reface cabinets
  • New quartz counters, sink, faucet
  • Backsplash, hardware, lighting
  • Refinished or new flooring
Mid-range remodel
$85,000 – $170,000
  • Semi-custom cabinetry, new layout
  • Quartzite or marble counters
  • Open up to family room (flush beam)
  • Full appliance package (Thermador/JennAir)
  • City of Las Vegas permits in-house
Full custom luxury
$180,000 – $320,000+
  • Custom rift-cut hardwood cabinetry
  • Imported stone + full slab backsplash
  • Sub-Zero / Wolf / Miele appliance package
  • Engineered structural opening
  • Integrated millwork & lighting design

Cost breakdown

Where the money goes in a Las Vegas kitchen remodeling

Based on our mid-range Las Vegas projects ($85,000 – $170,000). Percentages are shares of the total contract, not add-ons — every line below is already inside the fixed price you sign.

Cost breakdown for a mid-range kitchen remodeling project in Las Vegas
Line itemShareTypical spend
Cabinetry & millworkBiggest single line. Semi-custom to full custom boxes, doors, drawer hardware and any built-in panels.32%$27,200 – $54,400
Labor & project managementOur own carpenters, tile setters and finishers, plus the project lead who runs the schedule and inspections.24%$20,400 – $40,800
Countertops & backsplashSlab cost, template, fabrication, waterfall and edge detail, plus tile or slab backsplash.12%$10,200 – $20,400
AppliancesPackage cost swings the widest here — panel-ready and pro ranges can double this line on their own.11%$9,400 – $18,700
Plumbing, electrical & HVACRough-in and trim, added circuits, code-required upgrades, vent runs for the new hood location.10%$8,500 – $17,000
Flooring, paint & drywallPatch and finish after demo, plus continuous flooring where the old kitchen footprint changes.6%$5,100 – $10,200
Design, engineering & 3DMeasured as-builts, full construction drawings, renders and the spec book you sign off on.3%$2,600 – $5,100
Permits & inspectionsJurisdiction fees and plan review, pulled under NSCB #0095372 — never under your name.2%$1,700 – $3,400

Process

How a Las Vegas kitchen remodeling runs, week by week

  1. 01Week 1
    Discovery & site walk

    We walk the home, measure as-built, listen to how you actually use the kitchen, and align on scope and budget before anyone signs anything.

  2. 02Weeks 2–6
    Design & material selections

    Architectural drawings, full 3D renders and a complete spec book — cabinetry, stone, tile, hardware, appliances. You sign off on everything before we order.

  3. 03Weeks 6–10
    Permits & material lead time

    We submit permits and place every order in parallel. Custom cabinetry is the long pole; stone and appliances follow. Demo starts only when materials are on-site.

  4. 04Weeks 11–13
    Demo & rough-in

    Selective demo, structural opening (if any), plumbing rough, electrical rough, HVAC adjustments. Inspections passed before close-up.

  5. 05Weeks 14–17
    Cabinetry, stone, appliances

    Cabinet install, template-and-fabricate stone, appliance install, tile and paint. The kitchen takes shape in this window.

  6. 06Weeks 18–20
    Finish & handover

    Plumbing trim, electrical trim, punch list, deep clean, walk-through. You get a binder with every spec, warranty and care guide before we hand over the keys.

Local detail

What's different about a kitchen remodel in Las Vegas

The City of Las Vegas housing stock skews older than Henderson and Summerlin — 1960s–1990s ranches in Paradise, Lone Mountain, Charleston Heights and Spring Mountain corridor. That means closed-off cooking layouts, 21-inch upper cabinets, original galvanized supply lines in places, and undersized electrical panels. Most full kitchen remodels inside the City of Las Vegas include a partial re-pipe of the kitchen wet wall and an electrical-service review.

City of Las Vegas Building & Safety plan-review turnaround is typically 2–4 weeks for kitchen remodels. We pull all four permits (structural, mechanical, electrical, plumbing) in parallel rather than sequentially to keep the schedule moving.

Hard-water mineral content across the City of Las Vegas is high enough to chew through chrome faucets within a few years. We default to PVD-finish brushed brass, matte black or polished nickel on all kitchen builds inside the city, and recommend a kitchen-line softener loop on luxury builds.

Inside the City of Las Vegas urban core, HOA architectural review is rare for interior work — most parcels are not under HOA control. In Centennial Hills and Tule Springs HOAs do exist and we coordinate where the scope triggers review.

Permits & jurisdiction

Build4U pulls every permit directly with the City of Las Vegas Department of Building & Safety — structural, mechanical, electrical and plumbing. Typical plan-review turnaround for a kitchen remodel runs 2–4 weeks. We pull all four permit categories in parallel rather than sequentially. HOA architectural review (where the parcel falls inside a Centennial Hills, Tule Springs or similar HOA) is submitted in parallel — we draft the packet, attach the renders and handle the back-and-forth so you don't have to.

5.0 · 2 reviews

What Las Vegas homeowners say

"The detail in our kitchen is unreal — every reveal, every shadow line. Worth every penny."

Marcus T.

"Most contractors disappear after the deposit. This team showed up every single day."

Priya N.

Recent kitchen remodeling projects across the Las Vegas Valley

All projects →

These are Build4U jobs in neighboring valley communities — same crews, same kitchen remodeling scope, same NSCB #0095372 license that builds in Las Vegas. Each card shows where the project was actually built.

Las Vegas FAQ

Kitchen Remodeling in Las Vegas, answered.