Build4U is a licensed Henderson home addition contractor designing and building room additions, primary-suite expansions, family-room extensions and second-story additions across Anthem, Seven Hills, MacDonald Highlands, Green Valley and Inspirada. One team handles structural engineering, City of Henderson permits, foundation, framing and finish — so the new addition reads as original to the house.

Trusted by Homeowners & the Industry
Working in Henderson
Many Henderson additions are primary-suite expansions on 1990s and early-2000s estates in Anthem and Seven Hills, or family-room and second-story additions where the lot is too tight for a footprint expansion. We match stucco texture, window line and roof profile to the existing house and submit HOA architectural packages for Anthem CC, Seven Hills, MacDonald Highlands and Lake Las Vegas in parallel with the City of Henderson plan check.
City of Henderson Building & Safety permitting handled in-house, including structural, mechanical, electrical and plumbing. HOA architectural review coordinated for Anthem CC, Seven Hills, MacDonald Highlands, Green Valley Ranch and Lake Las Vegas.
Neighborhoods we serve
- Anthem & Anthem Country Club
- Seven Hills
- MacDonald Highlands
- Green Valley & Green Valley Ranch
- Lake Las Vegas
- Inspirada & Cadence
Nevada State Contractors Board GC license #0095372 · General liability + workers' comp · BBB-rated · Over a decade building in the Las Vegas Valley.
Henderson pricing
What a home additions typically costs in Henderson
Home addition cost in Henderson is driven by square footage, foundation and roof tie-in complexity, and whether the addition is single or second story. Real 2025 Henderson ranges:
- 250–450 sq ft single-story addition
- New foundation and roof tie-in
- HVAC and electrical extended from existing
- Stucco and roofing matched to the house
- Windows and doors
- City of Henderson permits & inspections
- 500–900 sq ft addition
- Full bath or kitchen extension included
- Engineered structural tie-in to existing framing
- New HVAC zone
- Custom millwork and finishes
- HOA architectural review handled
- 800–1,500 sq ft second story
- Foundation and existing-wall structural upgrade
- New stair and structural load path
- Full mechanical, electrical and plumbing
- Roof removal and rebuild
- Complete architectural and engineering package
Process
How a Henderson home additions runs, week by week
- 01Weeks 1–3Feasibility & survey
Setback and lot-coverage check, existing foundation and roof-tie-in assessment, and a realistic scope-and-budget conversation before design.
- 02Weeks 4–10Design & engineering
Architectural drawings tying the addition into the existing structure, structural engineering for the new load path and roof connection, elevations matched to the existing facade, and a full finish spec.
- 03Weeks 11–17Permits & HOA
Permit submittal with structural calcs, plus HOA architectural review — additions always trigger review because they change the exterior. Both run in parallel.
- 04Weeks 18–24Foundation & framing
Excavation, footings, slab, framing and roof tie-in, windows and doors, then stucco and roofing matched to the existing house.
- 05Weeks 25–30Rough-in & close-up
Plumbing, electrical and HVAC extended from the existing systems (we verify panel and unit capacity first), insulation, drywall and texture.
- 06Weeks 31–36Finishes & handover
Flooring, cabinetry, tile, paint, trim, lighting, final inspections, punch list and handover with the warranty binder.
Local detail
What's different about a home addition in Henderson
Setbacks and lot coverage decide what's possible before design does. Henderson parcels — especially in Anthem, Inspirada and Cadence, where lots are tighter than the older Green Valley stock — often have less buildable rear yard than owners expect. We pull the parcel data and mark the buildable envelope on day one.
Roof tie-in is where addition quality shows. Matching an existing Henderson tile roof means sourcing the same profile and color, and blending the new plane so it doesn't read as a bolt-on. We source tile matches during design; discontinued profiles sometimes mean pulling tile from a less-visible elevation and using new tile there instead.
A second-story addition is a structural project first. The existing foundation and first-floor walls have to be evaluated and usually reinforced to carry the new load, and the entire existing roof comes off. It's the most disruptive scope we build, and it requires moving out — we're direct about that before you commit.
Every Henderson addition triggers HOA architectural review because it changes the exterior by definition. Anthem CC, Seven Hills, MacDonald Highlands and Lake Las Vegas each want elevations, material samples and neighbor sightline analysis. Plan on 3–6 weeks, submitted in parallel with the city.
Home addition permits go to the City of Henderson Building & Safety Division with a full structural submittal — engineered calculations for the new foundation, framing, roof tie-in and, on second stories, the reinforcement of existing walls and footings — plus mechanical, electrical and plumbing. Plan review typically runs 4–8 weeks. HOA architectural review is mandatory for additions and runs in parallel; we prepare and submit both.
5.0 · 1 reviews
What Henderson homeowners say
"Most contractors disappear after the deposit. This team showed up every single day."
More in Henderson
Other services we offer in Henderson
Henderson FAQ
Home Additions in Henderson, answered.

Ready to remodel? Let's begin.
Free in-home consultation across the Las Vegas Valley — clear next-steps proposal within 48 hours.
5329 Cameron St #104-B, Las Vegas, NV 89118Mon–Fri 8:00 AM–6:00 PM · Sat 9:00 AM–2:00 PM (by appointment)Serving Henderson, Summerlin, Paradise, North Las Vegas & Spring Valley