Las Vegas, NV
Bathroom Remodeling in Las Vegas
Build4U is a licensed Las Vegas bathroom remodeling contractor rebuilding bathrooms across the Valley as full gut renovations — new framing where it makes sense, new sheet-membrane waterproofing, new plumbing and electrical, all self-performed by our own crews. Every Las Vegas bathroom remodel runs as design-build under a single project manager from first walk-through to handover.

Trusted by Homeowners & the Industry
Working in Las Vegas
Las Vegas bathrooms span a wide spectrum — compact guest baths in 1970s ranches near Paradise, primary suites in 1990s Spring Valley homes, modern infill in the urban core. Our most common scope is converting a tub-shower combo into a true curbless wet room with a freestanding tub. We handle waterproofing, slope framing and the City of Las Vegas plumbing permit in one workflow.
City of Las Vegas permitting handled in-house, including structural, mechanical, electrical and plumbing. HOA architectural coordination handled when the scope triggers it.
Neighborhoods we serve
- Downtown & Arts District
- Lone Mountain
- Tule Springs
- Centennial Hills
- Charleston Heights
- Spring Mountain corridor
Nevada State Contractors Board GC license #0095372 · General liability + workers' comp · BBB-rated · Over a decade building in the Las Vegas Valley.
Las Vegas pricing
What a bathroom remodeling typically costs in Las Vegas
Bathroom remodel cost across the City of Las Vegas depends on the shower system (curbless wet rooms drive the budget), vanity tier and stone choice. 2025 ranges from our City of Las Vegas quotes:
- Existing footprint & layout
- New tile floor & shower surround
- New vanity & quartz top
- New toilet, fixtures, lighting
- New mirror, accessories, paint
- Reconfigured layout
- Custom vanity + dual sinks + stone top
- Frameless glass shower enclosure
- Freestanding tub + filler
- Designer tile, lighting, mirrors
- Permits & inspections in-house
- Curbless wet room (shower + tub)
- Steam generator + body sprays
- Heated floors + towel warmers
- Custom walnut or rift-oak vanity
- Full-height slab stone walls
Cost breakdown
Where the money goes in a Las Vegas bathroom remodeling
Based on our mid-range Las Vegas projects ($55,000 – $115,000). Percentages are shares of the total contract, not add-ons — every line below is already inside the fixed price you sign.
| Line item | Share | Typical spend |
|---|---|---|
| Labor & project managementBathrooms are labor-dense: waterproofing, slope, tile layout and glass fitting all have to be exact. | 28% | $15,400 – $32,200 |
| Tile, stone & waterproofingMaterial plus the Schluter-Kerdi assembly behind it. This is the line you never want value-engineered. | 20% | $11,000 – $23,000 |
| Vanity, cabinetry & mirrorsCustom or semi-custom vanity, linen storage, integrated lighting and mirror package. | 14% | $7,700 – $16,100 |
| Plumbing rough-in & fixturesDrain and supply relocation, valves, freestanding-tub filler, shower system and trim. | 13% | $7,200 – $15,000 |
| Glass & shower enclosureFrameless heavy glass is fabricated to the finished opening, so it's ordered after tile. | 9% | $5,000 – $10,400 |
| Electrical, heat & ventilationAdded circuits, heated floor mat, in-mirror lighting, quiet exhaust sized to the room. | 8% | $4,400 – $9,200 |
| Design & selectionsLayout drawings, elevations and the full finish schedule before demo starts. | 5% | $2,800 – $5,800 |
| Permits & inspectionsPlumbing and electrical permits with the governing jurisdiction, pulled on our license. | 3% | $1,700 – $3,500 |
Process
How a Las Vegas bathroom remodeling runs, week by week
- 01Week 1Discovery & site walk
We walk the bathroom, scan existing plumbing, talk about how the room actually works for you, and align on scope and budget.
- 02Weeks 2–5Design & selections
Layout drawings, 3D renders, full material spec — vanity, stone, tile, fixtures, glass. You approve before anything is ordered.
- 03Weeks 5–8Permits & lead time
Plumbing and mechanical permits submitted; custom vanity, stone slab and glass enclosure ordered. We don't start demo until materials are on-site.
- 04Weeks 9–10Demo & rough-in
Demo to studs and slab, new waterproofing membrane, plumbing rough, electrical rough, niche and bench framing, slope pour for curbless showers.
- 05Weeks 11–13Tile, stone, finishes
Tile setting, stone install, vanity drop, paint, trim. Glass measured after tile is set and ordered for install in the final week.
- 06Weeks 14–15Trim, glass & handover
Plumbing trim, electrical trim, glass install, punch list, deep clean, walk-through. Full warranty binder at handover.
Local detail
What's different about a bathroom remodel in Las Vegas
Most pre-1985 Las Vegas bathrooms have galvanized supply lines, cast-iron drain stacks and original waterproofing that's well past its design life. Every full bathroom gut inside the City of Las Vegas includes new PEX or copper supply, new ABS drain runs where the existing system is failing, and a full sheet-membrane waterproofing system in the wet zone.
Inside the urban core, primary suites are often tight — converting to a true wet-room layout sometimes requires borrowing a few feet from an adjacent closet or hallway. We model the layout in 3D before construction so the proportions are right.
Hard water across the City of Las Vegas shortens the life of chrome and standard polished-nickel fixtures. We default to PVD-finish brushed brass, matte black or polished nickel — finishes that survive 10+ years in Vegas water.
City of Las Vegas plumbing permits are required for any drain relocation. Slab pour-back inspections are scheduled at the front of the timeline so concrete cure time doesn't compress tile work.
Build4U pulls City of Las Vegas plumbing, mechanical and electrical permits in-house for every bathroom remodel. Typical turnaround is 2–3 weeks for full primary-suite gut remodels. Slab pour-back inspections (when drains move) and shower-pan water tests are scheduled before tile-in. HOA architectural coordination handled where the scope (Centennial Hills, Tule Springs, etc.) requires it.
5.0 · 1 reviews
What Las Vegas homeowners say
"Most contractors disappear after the deposit. This team showed up every single day."
Recent bathroom remodeling projects across the Las Vegas Valley
All projects →These are Build4U jobs in neighboring valley communities — same crews, same bathroom remodeling scope, same NSCB #0095372 license that builds in Las Vegas. Each card shows where the project was actually built.
Las Vegas FAQ
Bathroom Remodeling in Las Vegas, answered.

Ready to remodel? Let's begin.
Free in-home consultation across the Las Vegas Valley — clear next-steps proposal within 48 hours.
5329 Cameron St #104-B, Las Vegas, NV 89118Mon–Fri 8:00 AM–6:00 PM · Sat 9:00 AM–2:00 PM (by appointment)Serving Henderson, Summerlin, Paradise, North Las Vegas & Spring Valley
